51品茶全国一品楼_一品楼免费论坛_全国龙凤信息论坛_凤楼阁信息兼职2025

RETURN

PERFO

900 KTPA AMIN Captive Copper Smelter Project, PT. Amman Mineral Industri (AMIN), Indonesia

 

Throughput capacity: 900kt/a copper concentrate, by-product: 815kt/a sulfuric acid.
World-class mining company, owner of the second largest copper and gold mine in Indonesia -  Batu Hijau Copper Mine.